COMPLIMENTS LETTER PROJECT: INSTALL 01 HANGER SHACKLE OF DRAPE CHAIN NO.8 ON ANCHOR LEG CHAIN NO.8 OF TBVN MOORING SYSTEM AT SU TU DEN OIL FIELD WITH WATER DEPTH IS 48M
Date posted:
10/12/2024
-
PROJECT: INSTALL 01 HANGER SHACKLE OF DRAPE CHAIN NO.8 ON ANCHOR LEG CHAIN NO.8 OF TBVN MOORING SYSTEM AT SU TU DEN OIL FIELD WITH WATER DEPTH IS 48M
-
CLIENT: CL JOC
-
TIME: 31st OCTOBER, 2024