News
Pressure Activated Sealant shall be applied to fix and Stop ...
Date posted: 26/08/2024
INSTALL THE 10” CLAMP TO FIX THE LEAKING 10” GAS PIPELINE ...
UNDERWATER SURVEY BOTTOM VESSEL NB 950
Date posted: 10/06/2024
REPLACEMENT HANGER SHACKLE NO. 13 FOR MOORING CHAIN NO. 8 ...
UNDERWATER INSPECTION IN LIEU OF DRY DOCK FOR FPSO PTSC LAM ...
Date posted: 02/05/2024
UNDERWATER CLEAN MARINE GROWTH OF FLATFORM MSP-1 & MSP-10 ...
Date posted: 07/12/2023
UNDERWATER INSPECTION IN LIEU OF DRY DOCK FSO GOLDEN STAR
Date posted: 05/12/2023
UNDERWATER INSPECTION IN LIEU OF DRY DOCK FPSO SONG DOC MV19
PERSONNEL RECRUITMENT INFORMATION
Date posted: 11/09/2023
UNDERWATER INSPECTION IN LIEU OF DRY DOCK PVD VI JACK-UP RIG
Date posted: 21/08/2023